AIMS Project Taster Session (Stranraer Campus)
Fri 6 Sep 2024 9:30 AM - 4:30 PM
STEM Hub, Dumfries and Galloway College, Lewis St, Stranraer, DG9 7AL
Description
A hands on experience with the AIMS Project team to introduce and inspire about the future of manufacturing.
No experience or qualifications required.
This free taster session will cover a basic introduction to all our equipment such as CNC Turning, CNC Milling, 3D Modelling, 3D Printing, 3D Scanning and Probing, and Collaborative Robots (Cobots).
Please let us know if you have any dietary requirements or if you would like help with transport by e-mailing: aims@dumgal.gov.uk by the 3rd September at the latest.
Location
STEM Hub, Dumfries and Galloway College, Lewis St, Stranraer, DG9 7AL